» Блог

Блог


XCMG XZ400 HDD Trenchless Horizontal Directional Drilling Equipment

XCMG Tunnel Drilling Rigs Solve Construction Problems In Many Locations

Hard rock is challenging, coal rock geology is complex, and deep hole precision control is challengingMines in many provinces of my country face their own challenges in drilling. XCMG’s crawler-type fully hydraulic tunnel drill rigs for coal mines Using superior performance to overcome local challenges, they have delivered excellent results in both efficiency and safety in many locations. Guizhou: …

XCMG Horizontal Directional Drilling Rig for Underground Pipeline Construction Project Along the Coast of a Middle Eastern City

XCMG Horizontal Directional Drilling Rig for Underground Pipeline Construction Project Along the Coast of a Middle Eastern City

In an underground pipeline construction project along the coast of a Middle Eastern city, the XCMG XZ1350E horizontal directional drilling rig (ЖЕСТКИЙ ДИСК) efficiently completed the pipeline laying task, ensuring on-time project delivery and earning widespread local acclaim for its outstanding construction quality. The coastal strata in the construction area are soft, with severe groundwater infiltration. The complex and variable geological

XCMG Horizontal Directional Drilling Rigs Protect Ecological Resources

XCMG Horizontal Directional Drilling Rigs Protect Ecological Resources

Недавно, a XCMG XZ5060 horizontal directional drill (ЖЕСТКИЙ ДИСК) successfully completed a critical pullback operation during the construction of a DN711*1300m oil pipeline project in Liaoning Province. This pipeline project serves as a critical link between energy supply and consumption. Upon completion, it will significantly reduce crude oil transportation costs and significantly enhance energy transportation capacity in Liaoning Province and the

XCMG Horizontal Directional Drilling Rig Efficiently Assists in the Construction of Xiamen Water Replenishment Project

XCMG Horizontal Directional Drilling Rig Efficiently Assists in the Construction of Xiamen Water Replenishment Project

The Xiamen Water Supply Project is currently underway. The XCMG XZ1600F horizontal directional drilling rig, with its powerful power and precise drilling capabilities, delivers a single drill rod in just 3 Минут, achieving an average daily drilling speed exceeding 100 метров. With its high efficiency and stability, it has become a core tool for project advancement. The Xiamen Xiang’an Water

XCMG Assists In The First Large-diameter Pipe Jacking Project In Southeast Guizhou

XCMG Assists In The First Large-diameter Pipe Jacking Project In Southeast Guizhou

The project involves the construction of new drainage pipes with diameters ranging from DN300 to DN2600mm, totaling approximately 1,700 метров. The pipe jacking construction section will be 815 метров в длину. To address issues such as cutterhead blockage and poor mud drainage caused by sticky mud in dry rock formations, XCMG technicians, taking into account local geological conditions, innovatively developed a

XCMG Pipe Jacking Machine Helps Hunan Water Conservancy Project

XCMG Pipe Jacking Machine Helps Hunan Water Conservancy Project

With the XCMG XDN1800-R pipe jacking machine, the cutterhead precisely reached the designated location in the receiving well, successfully completing the pipe jacking section of a single water conservancy project in Hunan Province. This marks a crucial step toward the project’s goal of water supply. The project, with a total length of 1,147 meters and a single jacking distance of

XCMG's super-large tower helps top out the tallest main tower of the Ma'anshan Yangtze River Highway-Rail Bridge

XCMG’s super-large tower helps top out the tallest main tower of the Ma’anshan Yangtze River Highway-Rail Bridge

The main tower of Pier Z4 of the Ma’anshan Yangtze River Bridge on the Chaoma Railway has been successfully capped, with XCMG’s XGT15000-600S crane lifting a 98.5-ton steel tower segment to over 300 meters for precise docking and installation. All three main towers of the bridge have now been capped, and the cantilever erection of the steel beams is about

XCMG helps build Shanxi's first high-speed railway with a speed of 350 kilometers per hour

XCMG helps build Shanxi’s first high-speed railway with a speed of 350 kilometers per hour

Crossing steep slopes and cascading waterfalls, more than ten XCMG S1 series tower cranes stand tall on the eastern foothills of the Taihang Mountains, supporting the construction of the Xiongxin High-speed Railway. The Xiongxin High-speed Railway is Shanxi Province’s first 350 km/h high-speed railway and a crucial component of the Beijing-Kunming Corridor, a key corridor within my country’sEight Horizontal

XCMG's super-large tower helps build the Shuangliu Yangtze River Bridge

XCMG’s super-large tower helps build the Shuangliu Yangtze River Bridge

Amidst the vibrant spring scenery and rippling blue waters, the majestic north main tower of the Wuhan Shuangliu Yangtze River Bridge is rising from the ground. Two XCMG XGT2230A-100S cranes are efficiently and accurately assembling the tower columns, accelerating the construction of the bridge’s north main tower. With a main span of 1,430 meters and a designed height of 211.78 …

Mud technology for long distance pipe laying

Неразрушающий неземляной ремонт дренажных труб

С непрерывным углублением городской модернизации, Городские подземные трубопроводы (такие как канализационные трубопроводы, водопроводы, Газопроводов, Теплопроводы, силовые кабели и кабели связи, Др.) будет становиться все более и более плотным, формирование огромной подземной трубопроводной сети. Так как срок службы всех трубопроводов ограничен, когда они используются в течение определенного периода времени, они будут …

Применение геомагнитной системы рулевого управления в строительстве горизонтально-направленного бурения

Применение геомагнитной системы рулевого управления в строительстве горизонтально-направленного бурения

Процесс строительства горизонтально-направленного бурения в целом можно разделить на три этапа: Бурение пилотных скважин, Предварительное расширение, и откат трубопровода назад. Качество траектории пилотного отверстия напрямую влияет на величину силы отката, и предотвращение риска наклонно-направленного пересечения в значительной степени отражается в процессе строительства наклонно-направленного бурения. Поэтому, только освоив продвинутое рулевое управление …

Прикладные исследования бестраншейного строительства трубопроводов в водоохранной инженерии

Прикладные исследования бестраншейного строительства трубопроводов в водоохранной инженерии

С развитием бестраншейной технологии строительства трубопроводов, Решена проблема, заключающаяся в том, что крупномасштабные откосы или опорные земляные работы не могут быть выполнены на основной городской территории. В данной работе в основном рассматриваются случаи применения технологии домкратирования труб и наклонно-направленного бурения и размещения в гидротехнике при бестраншейной технологии строительства трубопроводов, и анализирует стоимость двух …

  • О нас

    Ухань Yichao технологии оборудование Co., ООО. является профессиональным поставщиком горизонтального направленного буровых установок. Мы являемся авторизованным дистрибьютором XCMG и имеет почти 10 опыт лет Бестраншейная трубопровода.

  • СВЯЖИТЕСЬ С НАМИ

    Отправить по электронной почте: m13517277987@163.com

    Тель: 0086-18162684887

    Вечат/WhatsApp: 0086-18162684887/0086-13517277987

    Skype: мифотма

     

  • Чтокитай