» HDD Accessories and Tools » Hydraulic Tongs » HBT200 Hydraulic Power Chain Breakout Tool Drill Pipe Disconnect Unit
  • HBT200 Hydraulic Power Chain Breakout Tool Drill Pipe Disconnect Unit

    • Description

    HBT200 Hydraulic power chain tongs are equipped with an electric high-pressure hydraulic pump station installed on the main machine. There are one main tong and one backup tong. Each tong is equipped with a chain and a clamping cylinder to increase or decrease chain links. The clamping diameter of drilling tools is large. The main tong is equipped with a push-pull unscrewing cylinder. The unscrewing drill has drill bits, down-the-hole hammers, screw drills, coring tools, drill rods, drill collars, casing, etc. The structure is compact and the operation is simple. It can be used on the drilling platform to lift and unscrew drill rods, drilling tools, drill collars, drill bits, etc. It can be installed on a rig with or without wheels, and it is easy to unscrew various threaded drilling tools at the drilling site or workshop.HBT200 Hydraulic Power Chain Breakout Tool Drill Pipe Disconnect Unit HBT200 Hydraulic Power Chain Breakout Tool Drill Pipe Disconnect Unit

    Main parameters

    Applicable drill diameter 4-24 in
    Chain link 23 sections x2
    Hydraulic pump flow 15L/min
    Working pressure 20Mpa
    Motor power 3.75kW
    Three-phase power supply 380V 50Hz
    Unbuckling torque 200KN.m
    Make-up torque 130N.m
    Weight 900kg
    Dimensions 1400x1300x1100 (horizontally)
    1400x1100x900 (vertically)

    Operation process

    1. The pump station oil tank capacity is 45L, add L-HM46 or 68 new hydraulic oil until the oil mark is displayed.
    2. Connect three-phase electricity, the motor fan rotates clockwise to be correct.
    3. Add or subtract chain links according to the diameter of the clamped drill.
    4. The C handle is used to tighten or loosen the main clamp, loosen forward and tighten backward.
    5. The B handle is used to tighten or loosen the backup clamp, loosen forward and tighten backward.
    6. The A handle is loose or tight, and the positive rotation buckle is loose forward and tight backward.
    7. According to the torque of the drill, adjust the system pressure to a maximum of 20pa.
    8. When changing between horizontal and vertical work, just change the position of the trolley frame fixing bolts.
    9. The pump station is installed on the trolley for easy transportation. The trolley wheels are installed when in use

    , , , , , , , ,

    Enquiry Form ( we will get back you as soon as possible )

    Name:
    *
    Email:
    *
    Cellphone:
    *
    Choose eigher one(s): Whatsapp:

    Wechat:

    Country:

    Company Name:

    Message:

    Verification:
    1 + 6 = ?

    Maybe you like also

  • Product Categories

  • Latest Products

  • ABOUT US

    Wuhan Yichao Technology Equipment Co., Ltd. is a professional supplier of horizontal directional drilling rigs. We are XCMG authorized distributor and has nearly 10 years of trenchless pipeline experience.

  • CONTACT US

    Email: m13517277987@163.com

    Tel: 0086-18162684887

    Wechat/WhatsApp: 0086-18162684887/0086-13517277987

    Skype: myfotma

     

  • WhatChina