Preparation of Trenchless Drilling

» Tags » Preparation of Trenchless Drilling
Preparation Work Before The Start Of Trenchless Drilling

Preparation Work Before The Start Of Trenchless Drilling

Before the trenchless drilling rig starts construction, the following preparations must be made to ensure the smooth progress of the construction: 1. Construction site detection: Use detection instruments to find out the direction, depth and nature of the original underground pipe network, and make a mark; then verify with the help of municipal archives and manual on-site surveys. 2. Check …

  • ABOUT US

    Wuhan Yichao Technology Equipment Co., Ltd. is a professional supplier of horizontal directional drilling rigs. We are XCMG authorized distributor and has nearly 10 years of trenchless pipeline experience.

  • CONTACT US

    Email: m13517277987@163.com

    Tel: 0086-18162684887

    Wechat/WhatsApp: 0086-18162684887/0086-13517277987

    Skype: myfotma

     

  • WhatChina